REQUEST FOR PROPOSAL (RFP)
MASS BALANCE AUDIT IN BAYU UNDAN OFFSHORE PRODUCTION FACILITY AND THE DARWIN LNG
Ref: ANPM/PROC/RFP/17/007
Background:
Autoridade Nacional do Petrόleo e Minerais (ANPM) is a public institution established under the Decree Law No.1/2016 dated 9 February 2016 as the 1st amendment to the Decree Law no. 20/2008 of the Democratic Republic of Timor-Leste, with its role and functions as Regulatory Authority on behalf of the Ministry Responsible for Petroleum and Mineral Sectors to administer and regulate the upstream and downstream petroleum sectors and all the Mineral sectors within Timor-Leste Onshore and Offshore territory. The ANPM also in accordance with the Timor Sea Treaty signed between Timor-Leste and Australia is as a Designated Authority (DA) with the role and functions to administer and regulate upstream petroleum activities in the Joint Petroleum Development Area (JPDA) on behalf of Timor-Leste and Australia.
The Bayu Undan Field is located in the Timor Sea and covers an area of over 60,000 acres. The field commenced production in February 2004 with producing gas and liquids. The lean gas production is exported to the LNG plant in Darwin with remaining is re-injected to maintain reservoir pressure.
The purpose of the audit is to verify the mass of hydrocarbon entering and leaving each system in Bayu Undan facility and Darwin LNG in order to ensure the balance of process plant to meet design intent. Thus, the ANPM is planning to engage qualified consultant to assist ANPM Metering and Process team to carry out “Mass Balance Audit” in Bayu Undan and at Darwin LNG plant in Northern Territory, Australia.
The ANPM is seeking for a qualified consultant with experience in hydrocarbon mass balance auditing, hydrocarbon fluids measurement, quality determination, and quantity determination and ability to assess and analyse the functionality and operability of the metering instruments. The details of the RFP can be downloaded by clicking here or can be obtained in ANPM Office in Palacio.
Lodgement:
The application should be marked ‘Confidential’ and for the attention of: Sr. Humberto Pereira, ANPM Procurement Section and submitted by E-mail through anp.bid@anp-tl.org or by hand or courier to:
Autoridade Nacional do Petróleo e Minerais
Ground Floor, East Wing of Palacio do Governo
Avenida Marginal, Building No.1
PO Box 113Telephone: +670 3324098,
Fax: +670 3324082, Dili, Timor – Leste
ANPM website: www.anpm.tl
Lodgement will be closed at 16:30 hours Timor Leste time on 07th of August 2017. Late applications will not be considered.
Further information:
Requests for further information should be made by email or telephone and directed to Mr. Digorio Pereira, Metering Officer at digorio.pereira@anpm.tl, +670 3324098/3317215/3317216/3312735.
Dili, 14th of July 2017